OEBB AUSBAU WESTBAHN
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project consists of adding capacity to two important bottlenecks in the Danube Axis, integral part of the TEN-T priority project No. 17 (railway axis Paris-Strasbourg-Stuttgart-Vienna-Bratislava), as part of the Austrian Government’s decision to increase capacity along this busy corridor. Two additional tracks will be added to the existing double track in sections in St. Pölten - Lo
- Status
- Under Construction
- Sector
- Mass Transit, Government, Rail
- Location
- Austria
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about OEBB AUSBAU WESTBAHN
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of adding capacity to two important bottlenecks in the Danube Axis, integral part of the TEN-T priority project No. 17 (railway axis Paris-Strasbourg-Stuttgart-Vienna-Bratislava), as part of the Austrian Government’s decision to increase capacity along this busy corridor. Two additional tracks will be added to the existing double track in sections in St. Pölten - Loosdorf (25 km long by pass) and Ybbs – Amstetten (17 km). |
Original sector | Transport |
Location
Country | Austria |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Government, Rail |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
