OEBB MARCHEGGER OSTBAHN
Sector: Rail • Location: Austria
Source: European Investment Bank (EIB)
The project consists of the modernisation and electrification of about 37.5 km of the current single track rail line between Wien-Stadlau and Marchegg, at the border between with Slovakia, which is currently used to its full capacity.
The aim is to improve significantly the journey speed and reduce the bottleneck between Vienna and Bratislava and consequently, enhance the Austrian part of the Ba
- Status
- Under Construction
- Sector
- Rail, Commercial, Government
- Location
- Austria
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about OEBB MARCHEGGER OSTBAHN
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the modernisation and electrification of about 37.5 km of the current single track rail line between Wien-Stadlau and Marchegg, at the border between with Slovakia, which is currently used to its full capacity. The aim is to improve significantly the journey speed and reduce the bottleneck between Vienna and Bratislava and consequently, enhance the Austrian part of the Baltic-Adriatic corridor. |
Original sector | Transport |
Location
Country | Austria |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Rail, Commercial, Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
