Off Site Water Extention - Escatawpa Hollow Park
Sector: Water Supply and Storage • Location: Wilmer, Alabama, United States of America
Source: Dodge
Install approximately 4,500 feet of 8 C-900 PVC Pipe. Install 110 feet of 16 steel casing dry jack and bore and 8 PVC Carrier Pipe in accordance with the Illinois Central Railroad Crossing Permit, including Bonds and Flagging Services required for the work. Install the specified meter and pressure regulator assembly. South Alabama Utilities (SAU) will provide the water main, valves, hydrants, fitt
- Status
- Closed
- Sector
- Water Supply and Storage, Cable car, Steel, Waste Processing and Treatment, Rail, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Government, Metal, Telecommunications
- Location
- Wilmer, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Off Site Water Extention - Escatawpa Hollow Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install approximately 4,500 feet of 8 C-900 PVC Pipe. Install 110 feet of 16 steel casing dry jack and bore and 8 PVC Carrier Pipe in accordance with the Illinois Central Railroad Crossing Permit, including Bonds and Flagging Services required for the work. Install the specified meter and pressure regulator assembly. South Alabama Utilities (SAU) will provide the water main, valves, hydrants, fittings, glands and casing pipe for this project. The Contractor will provide incidental items, incl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Wilmer |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cable car, Steel, Waste Processing and Treatment, Rail, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Government, Metal, Telecommunications |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
