OFF-SYSTEM STRIPING & RPM - DISTRICT 5
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
This project includes the restriping of several off-system routes throughout the District using ALL-WEATHER PAINT and the replacement of raised pavement markers (rpm) on these routes. The total net length of the project is approximately 255 miles. The counties containing routes that will be restriped are Appling, Bacon, Bryan, Bulloch, Camden, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, P
- Status
- Closed
- Sector
- Consumer Products, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about OFF-SYSTEM STRIPING & RPM - DISTRICT 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the restriping of several off-system routes throughout the District using ALL-WEATHER PAINT and the replacement of raised pavement markers (rpm) on these routes. The total net length of the project is approximately 255 miles. The counties containing routes that will be restriped are Appling, Bacon, Bryan, Bulloch, Camden, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, Pierce, Montgomery, Tattnall, Telfair, Toombs, Ware and Wayne . It is anticipated that the restriping and rpm replacement on the routes will improve safety by reducing lane departure crashes. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Road, Government |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
