logo

Office Building Alteration

Sector: Residential • Location: San Francisco, California, United States of America

Source: Dodge

Project
Start

Suite 3000: New Power And Signal Devices Thoughout The Space, New 2022 Title 24 Compliant Lighting And Controls. Minor Rework Of Tenant Suite Including 1 New Vav Box And Duct Distribution As Required For New Room Layout. Ref Pa #202505136386

Status
Prospective
Sector
Residential, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
Location
San Francisco, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Office Building Alteration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Office Building Alteration” is an infrastructure initiative in the Residential sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Suite 3000: New Power And Signal Devices Thoughout The Space, New 2022 Title 24 Compliant Lighting And Controls. Minor Rework Of Tenant Suite Including 1 New Vav Box And Duct Distribution As Required For New Room Layout. Ref Pa #202505136386

Budget

Location

Country

United States of America (USA)

State

California

City

San Francisco

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Residential, Power Generation (CCGT), Commercial, Manufacturing (Industrial)

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project