Office Building (Alteration)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
APPLICATION FILED TO CHANGE USE ON PART FIRST FLOOR TO INLCUDE A SCREENING ROOM. SCOPE OF WORK TO INCLUDE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS AND CEILING OF FIRST FLOOR. REMOVAL OF ROOF FINISH AND FLASHING ON ROOF AS PER DRAWINGS FILED HEREWITH.
- Status
- Failure
- Sector
- Commercial, Manufacturing (Industrial), Residential
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Office Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | APPLICATION FILED TO CHANGE USE ON PART FIRST FLOOR TO INLCUDE A SCREENING ROOM. SCOPE OF WORK TO INCLUDE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS AND CEILING OF FIRST FLOOR. REMOVAL OF ROOF FINISH AND FLASHING ON ROOF AS PER DRAWINGS FILED HEREWITH. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
