Office Building Alteration
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Gft Inc. Add Partitions For A Conference Room, A Shower Room For Personal Use Only And A Small Office Outlet As Needed For New Walk And Range, Add Can=Binets In Break Room And Replace A Sink, Ada As Required, Steven Booth In Office, Call For Inspections, Work To Be Done Coordinated In Field;Scc | Number Of Stories Above Grade: 1
- Status
- Prospective
- Sector
- Commercial, Residential, Manufacturing (Industrial)
- Location
- Asheville, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Office Building Alteration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Gft Inc. Add Partitions For A Conference Room, A Shower Room For Personal Use Only And A Small Office Outlet As Needed For New Walk And Range, Add Can=Binets In Break Room And Replace A Sink, Ada As Required, Steven Booth In Office, Call For Inspections, Work To Be Done Coordinated In Field;Scc | Number Of Stories Above Grade: 1 |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Asheville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
