Office Building (Alteration)
Planning schematics · New York · Last reported Mar 2025
Source: Dodge
"ARC'TERYX " Space B - Remove/Installation of non load bearing partitions, flooring, ceilings, finishes, new staircase per plans filed herewith to accommodate new layout for New tenant "Arc'Teryx". No change in egress, use or occupancy.
- Status
- Prospective
- Sector
- Residential, Manufacturing (Industrial), Commercial
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Office Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | "ARC'TERYX " Space B - Remove/Installation of non load bearing partitions, flooring, ceilings, finishes, new staircase per plans filed herewith to accommodate new layout for New tenant "Arc'Teryx". No change in egress, use or occupancy. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
