Office Building (Alteration)
Planning schematics · New York · Last reported Aug 2025
Source: Dodge
RENO OF 2STY BLDG: DEMO INT PARTITIONS, NEW PARTITIONS, BATHROOMS & KITCHEN. NEW WINDOW OPENINGS. EXTEND MEZZ. CHANGE USE ON 1FL, 1FL MEZZ & 2FL TO OBTAIN NEW CO WITH ARTIST'S STUDIO ON 1FL & ACC USE OF CARETAKER'S APT ON 2FL. NO CHANGE TO EGRESS OR BULK. Plumbing work associated with renovation of existing 2-story building. Replacement of existing plumbing fixtures and adding one sink, one utilit
- Status
- Prospective
- Sector
- Residential, Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT)
- Location
- Gowanus, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Office Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | RENO OF 2STY BLDG: DEMO INT PARTITIONS, NEW PARTITIONS, BATHROOMS & KITCHEN. NEW WINDOW OPENINGS. EXTEND MEZZ. CHANGE USE ON 1FL, 1FL MEZZ & 2FL TO OBTAIN NEW CO WITH ARTIST'S STUDIO ON 1FL & ACC USE OF CARETAKER'S APT ON 2FL. NO CHANGE TO EGRESS OR BULK. Plumbing work associated with renovation of existing 2-story building. Replacement of existing plumbing fixtures and adding one sink, one utility sink, one washing machine, two dishwashers and one shower. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Gowanus |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
