Office Building Floor 6
Sector: Commercial • Location: Philadelphia, Pennsylvania, United States of America
Source: Dodge
For Level Ii Interior Alterations At The 6Th Floor Northeast Corner With No Change To Group B Use & Occupancy Classification. Building Is Fully Sprinklered. All Work To Be Done Per Approved Plans And In Accordance With 2018 Iebc. Separate Permits Required For Mechanical, Electrical, Plumbing, And Fire Suppression Work. If Site Conditions Vary, Contact Design Professional Prior To Start Of Work. To
- Status
- Under Construction
- Sector
- Commercial, Manufacturing (Industrial), Power Generation (CCGT), Residential
- Location
- Philadelphia, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Office Building Floor 6
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For Level Ii Interior Alterations At The 6Th Floor Northeast Corner With No Change To Group B Use & Occupancy Classification. Building Is Fully Sprinklered. All Work To Be Done Per Approved Plans And In Accordance With 2018 Iebc. Separate Permits Required For Mechanical, Electrical, Plumbing, And Fire Suppression Work. If Site Conditions Vary, Contact Design Professional Prior To Start Of Work. Total Square Feet: 3169 |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Philadelphia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Power Generation (CCGT), Residential |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
