Office Building
Start · Alabama · Last reported Oct 2024
Source: Dodge USA
Office Alteration 1019 S 4Th St 2925Sf Interior Renovations To Single Story Office Building. Adding Doors And Windows Turning Two Large Offices Into Four Smaller Offices. Remove Non-Load Bearing Walls In Waiting / Reception Area For A More Open Floor Plan. Add An Additional Door Leading Into The Conference Room From Receptionist. New Partition Walls, Corridor Windows And Doors To Enclose New Offic
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- Gadsden, Alabama, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Office Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Office Alteration 1019 S 4Th St 2925Sf Interior Renovations To Single Story Office Building. Adding Doors And Windows Turning Two Large Offices Into Four Smaller Offices. Remove Non-Load Bearing Walls In Waiting / Reception Area For A More Open Floor Plan. Add An Additional Door Leading Into The Conference Room From Receptionist. New Partition Walls, Corridor Windows And Doors To Enclose New Offices, And Alter Existing Restroom. Provide Ada Compliant Restroom, New Counter Top. Work Is Not Out... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Gadsden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
