Office Building
Sector: Power Generation (CCGT) • Location: San Diego, California, United States of America
Source: Dodge
Building Construction:350/10Th Downtown: Building, Electrical And Mechanical Permit For A Proposed Tenant Improvement To An (E) Office Building For Suite 950. Work To Include Selected Demolition Of (E) Non-Load Bearing Walls And Ceiling System. New Non-Load Bearing, Non-Rated Walls And A New Suspended Acoustic Ceiling System. Modify Existing Electrical, Lighting Systems, Hvac Control And Distribut
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | start |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Building Construction:350/10Th Downtown: Building, Electrical And Mechanical Permit For A Proposed Tenant Improvement To An (E) Office Building For Suite 950. Work To Include Selected Demolition Of (E) Non-Load Bearing Walls And Ceiling System. New Non-Load Bearing, Non-Rated Walls And A New Suspended Acoustic Ceiling System. Modify Existing Electrical, Lighting Systems, Hvac Control And Distribution Systems. Relocated Existing And New Lighting. New Interior Finishes. (Sdpz) Add/Alt Tenant Im... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- TENANT IMPROVEMENT FOR A NAIL SALON, ELECTRICAL, VENT IN BATHROOM
