Office Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Ti 2,842 Sqft To Include New Offices, New Break Room, New Waiting And Exam Rooms With New Partition Walls, Interior Windows, Ceiling, Lighting, Power, Data, And Interior Finishes. New Mech, Hvac Equipment W/ Roof Support, And Electrical System. Total Square Feet: 2842
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
- Location
- Chula Vista, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Office Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Ti 2,842 Sqft To Include New Offices, New Break Room, New Waiting And Exam Rooms With New Partition Walls, Interior Windows, Ceiling, Lighting, Power, Data, And Interior Finishes. New Mech, Hvac Equipment W/ Roof Support, And Electrical System. Total Square Feet: 2842 |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Chula Vista |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
