logo

Office for Trees / Pham Huu Son Architects

Sector: Airport • Location: Vietnam

Source: ArchDaily

Project
Closed

A large mango tree at the central position of the current land plot was preserved instead of being cut down, with the mango tree retained to create a garden within the project, dividing the two main spaces: the office block and the Model House block. Also, at this location, there is an underground water reservoir with a capacity of up to 30 cubic meters, used to collect rainwater from the roof dur

Project Information FAQ

Project Information

3 Q
The project “Office for Trees / Pham Huu Son Architects” is an infrastructure initiative in the Airport sector, located in Vietnam. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A large mango tree at the central position of the current land plot was preserved instead of being cut down, with the mango tree retained to create a garden within the project, dividing the two main spaces: the office block and the Model House block. Also, at this location, there is an underground water reservoir with a capacity of up to 30 cubic meters, used to collect rainwater from the roof during rainy days. Moreover, rainwater is connected to a fish pond in the front yard where waste from fish and microorganisms is filtered, combined with an automatic irrigation pump system to supply water to greenery tanks on the roof and throughout the project's surrounding garden, creating a cycle of regeneration and water resource conservation.The project is constructed from unfired bricks - an environmentally friendly material easily accessible locally, combined with a series of sustainable solutions such as rainwater reuse, natural light utilization, solar energy, and a surrounding greenery system. Office for Trees is a clear testament to the commitment to sustainability in the creative architecture of Pham Huu Son Architects.The office project in Cam Lam-Khanh Hoa, located in Central Vietnam, is approximately 10 km north of Cam Ranh International Airport. According to the investor's requirements, the project is planned into two main areas: one is a flexible workspace for employees and reception area, and the other is a Model House space, providing customers with a deeper experience of living space, complete with amenities from bedrooms, kitchens, dining areas to bathrooms, aiming to provide the best experience in space and interior for the company's customers.Greenery is arranged throughout the spaces, with greenery tanks placed on the roof, not only creating a cool atmosphere for the space below but also combined with a system of ventilation slots and large glass doors to eliminate the need for air conditioning, even on hot days. Daylighting is optimized through gaps between the rows of plants on the roof, eliminating the need for daytime lighting. Solar panels are installed above the Model House area, providing clean energy for the entire office and blending into a sustainable and energy-efficient landscape.Text description provided by the architects.Vietnam is undergoing a profound transformation, where economic and social development is spreading, with large cities and urban areas emerging as new symbols replacing the green expanses of pristine tropical regions. However, this also implies that we are facing significant challenges, such as loss of green space, rising air temperatures, environmental pollution, and an increase in emissions. These issues not only affect the current quality of life but also forecast potentially more severe consequences in the future.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data