logo
ProjectDelayed

Office Mixed Use Redevelopment

Sector: Residential • Location: Seattle, Washington, United States of America

Source: Dodge

three separate parcels. The first parcel, located at 722 E. Union St. at the corner of Harvard and Union, contains the three-story Knights of Columbus building, which was built in 1913 and totals 33,196 squarefeet, according to public documents. The second parcel at 1409 Harvard Ave. contains a 15,360 square foot parking lot and the third parcel, located at 706 E. Union St., contains a 2,800 squar

Status
Failure
Sector
Residential, Manufacturing (Industrial), Commercial, Car parking, Automotive
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Office Mixed Use Redevelopment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Office Mixed Use Redevelopment” is an infrastructure initiative in the Residential sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

three separate parcels. The first parcel, located at 722 E. Union St. at the corner of Harvard and Union, contains the three-story Knights of Columbus building, which was built in 1913 and totals 33,196 squarefeet, according to public documents. The second parcel at 1409 Harvard Ave. contains a 15,360 square foot parking lot and the third parcel, located at 706 E. Union St., contains a 2,800 square foot parking lot.The proposed development includes adaptive reuse of the existing Knights of Co...

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Residential, Manufacturing (Industrial), Commercial, Car parking, Automotive

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project