Office Space Remodel at BCA
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
repurposing of two data center locations currently housed at the Bureau of Criminal Apprehension s Maryland Avenue office building and the Department of Revenue s Stassen Office Building. The space to be repurposed totals 1,263 square feet at the BCA location and 2,901 square feet at theStassen location, resulting in the transition in total of 4,164 square feet of space that has beenretrofitted as
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Data Center, Commercial, Government
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Office Space Remodel at BCA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | repurposing of two data center locations currently housed at the Bureau of Criminal Apprehension s Maryland Avenue office building and the Department of Revenue s Stassen Office Building. The space to be repurposed totals 1,263 square feet at the BCA location and 2,901 square feet at theStassen location, resulting in the transition in total of 4,164 square feet of space that has beenretrofitted as data center space back to usable office space.If funded, MN.IT would work with the Department of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Data Center, Commercial, Government |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
