Office Suites
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge USA
This project calls for the Tenant Build-Out of 3 units in an existing building (Suite A: 4,123SF; Suite B: 3,305SF); Suite C: 3,122SF). Interior Buildout of an Exisiting Business Suite in an Exisiting building. xtentof Work to include new Walls, Doors and Interior Finishes modifications to MEP System as Required
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Residential
- Location
- Suwanee, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Office Suites
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project calls for the Tenant Build-Out of 3 units in an existing building (Suite A: 4,123SF; Suite B: 3,305SF); Suite C: 3,122SF). Interior Buildout of an Exisiting Business Suite in an Exisiting building. xtentof Work to include new Walls, Doors and Interior Finishes modifications to MEP System as Required |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Suwanee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
