Office Tower Mixed Use
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
11-story office building with retail - Subgrade Parking for 226 vehicles proposed - Existing building to be demolished - Subgrade Parking: 69,606 SF - Various Storage Spaces: 21,967 SF - Conference Rooms: 2,420 SF - Misc. Space: 3,851 SF - Level 1 Retail Space: 4,888 SF - Office Space, Levels 1-11: 214,237 SF
- Status
- Under Construction
- Sector
- Automotive, Residential, Car parking, Commercial, Steel, Manufacturing (Industrial)
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Office Tower Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 11-story office building with retail - Subgrade Parking for 226 vehicles proposed - Existing building to be demolished - Subgrade Parking: 69,606 SF - Various Storage Spaces: 21,967 SF - Conference Rooms: 2,420 SF - Misc. Space: 3,851 SF - Level 1 Retail Space: 4,888 SF - Office Space, Levels 1-11: 214,237 SF |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Residential, Car parking, Commercial, Steel, Manufacturing (Industrial) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
