OH/DOT: Beverly Sidewalks Replacement
One of 10,000+ projects Taiyo tracks in Ohio.
Source: Dodge
WAS Beverly Sidewalk . Sidewalk replacement and ADA compliance updates: Center St. (priority 1). 4th Street (priority 2), 3rd Street (priority 3). Construction contract plans for Phase 1 of the Beverly Sidewalk improvements in Washington County with a project length of approximately 0.33 miles. This project will primarily be the replacement of sidewalks on Center Street, 4th Street, and 3rd Street
- Status
- Prospective
- Sector
- Road, Car parking, Automotive, Commercial
- Location
- Beverly, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about OH/DOT: Beverly Sidewalks Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WAS Beverly Sidewalk . Sidewalk replacement and ADA compliance updates: Center St. (priority 1). 4th Street (priority 2), 3rd Street (priority 3). Construction contract plans for Phase 1 of the Beverly Sidewalk improvements in Washington County with a project length of approximately 0.33 miles. This project will primarily be the replacement of sidewalks on Center Street, 4th Street, and 3rd Street in the Village of Beverly. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Beverly |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Automotive, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
