OH/DOT: Bridge and Culvert Improvements
Sector: Water Supply and Storage • Location: Mansfield, Ohio, United States of America
Source: Dodge USA
Bridge / Culvert Maintenance RIC US 0030 16.42 Brdg Emergency Emergency A RIC US 30 16.42 bridge hit in an accident and requires repairs. This project will remove the remaining damaged crossframe assembly and install temporary stiffening struts to prevent catastrophic buckling while more comprehensive repairs are being designed
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Road, Commercial, Waste Processing and Treatment
- Location
- Mansfield, Ohio, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about OH/DOT: Bridge and Culvert Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Bridge / Culvert Maintenance RIC US 0030 16.42 Brdg Emergency Emergency A RIC US 30 16.42 bridge hit in an accident and requires repairs. This project will remove the remaining damaged crossframe assembly and install temporary stiffening struts to prevent catastrophic buckling while more comprehensive repairs are being designed |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Mansfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Commercial, Waste Processing and Treatment |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
