OH/DOT: Bridge Repair (CO 005)
Sector: Bridge • Location: Columbus, Ohio, United States of America
Source: Dodge USA
FOR IMPROVING VARIOUS SECTIONS IN UNION AND BETHEL TOWNSHIPS, IN CHAMPAIGN AND CLARK COUNTIES, IN THE STATE OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING AND REPLACING THE EXISTING ASPHALT CONCRETE WEARING COURSES ON TWO SINGLE-SPAN PRESTRESSED BOX BEAM BRIDGES (CHP-29-2431 AND CLA-40-0373). WORKFOR CLA-40-0373 ALSO INCLUDES REMOVING AND REPLACING THREE EXISTING DETERIORATED PRE
- Status
- Closed
- Sector
- Bridge, Cement, Road, Commercial
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about OH/DOT: Bridge Repair (CO 005)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | FOR IMPROVING VARIOUS SECTIONS IN UNION AND BETHEL TOWNSHIPS, IN CHAMPAIGN AND CLARK COUNTIES, IN THE STATE OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING AND REPLACING THE EXISTING ASPHALT CONCRETE WEARING COURSES ON TWO SINGLE-SPAN PRESTRESSED BOX BEAM BRIDGES (CHP-29-2431 AND CLA-40-0373). WORKFOR CLA-40-0373 ALSO INCLUDES REMOVING AND REPLACING THREE EXISTING DETERIORATED PRESTRESSED BOX BEAMS. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
