logo

OH/DOT: Bridge Replacements

Sector: Commercial • Location: Ohio, United States of America

Source: Dodge USA

Project
Planning Schematics

Bridge Expansion HAM IR 75 11.09 1/1/2026 $67,500,000 Standard Build Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line and a portion of the final alignment of the exit ramp to Galbraith Road.(phase 4 TTV)

Status
Prospective
Sector
Commercial, Bridge, Rail, Road
Location
Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: Bridge Replacements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: Bridge Replacements” is an infrastructure initiative in the Commercial sector, located in Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge Expansion HAM IR 75 11.09 1/1/2026 $67,500,000 Standard Build Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line and a portion of the final alignment of the exit ramp to Galbraith Road.(phase 4 TTV)

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Rail, Road

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project