logo
ProjectClosed

OH/DOT: Culvert Replacement REBID

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

For Improving Various Sections In The City Of Hudson, Of Summit County, Of The State Of Ohio, In Accordance With Plans And Specifications By Removing A Portion Of An Existing Concrete Slab Structure On Stone Walls, Replacing It With A Precast Reinforced Three-sided Box Culvert, And Reinforcing The New Culvert Into The Existing Substructure. Work Also Includes Relocation Of Existing Curb And Minor

Status
Closed
Sector
Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial
Location
Hudson, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: Culvert Replacement REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: Culvert Replacement REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Hudson, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For Improving Various Sections In The City Of Hudson, Of Summit County, Of The State Of Ohio, In Accordance With Plans And Specifications By Removing A Portion Of An Existing Concrete Slab Structure On Stone Walls, Replacing It With A Precast Reinforced Three-sided Box Culvert, And Reinforcing The New Culvert Into The Existing Substructure. Work Also Includes Relocation Of Existing Curb And Minor Resurfacing To Accomodate A New Multi-use Path As Well As Minor Drainage Work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Hudson

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial

Article published date

2024-04-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project