OH/DOT: Culvert Replacement
One of 10,000+ projects Taiyo tracks in Ohio.
Source: Dodge
Culvert replacement on state Route 93 in Jackson County. For Improving A Section Of Sr 93 In The Township Of Franklin, County Of Jackson, State Of Ohio, In Accordance With The Plans And Specifications Of The Department Of Transportation By Replacing An Existing 72" Cmp W/ A 72" Conduit W Standard Half-height Headwalls, Rock Channel Protection, Full Depth Asphalt, Resurfacing, Field Pipe Relocation
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Commercial
- Location
- Franklin Township, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about OH/DOT: Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Culvert replacement on state Route 93 in Jackson County. For Improving A Section Of Sr 93 In The Township Of Franklin, County Of Jackson, State Of Ohio, In Accordance With The Plans And Specifications Of The Department Of Transportation By Replacing An Existing 72" Cmp W/ A 72" Conduit W Standard Half-height Headwalls, Rock Channel Protection, Full Depth Asphalt, Resurfacing, Field Pipe Relocation, Grading Improvements, And All Related Work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Franklin Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
