OH/DOT: D08 Pavement and Culvert Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project to repair and/or pave the inverts of various bridge size culverts within District 8 including GRE-835-0091. Repair deteriorated portions of the CMP Steel for GRE-42-1490 and WAR-48-0677. Reset shifted concrete box culvert section, install new full
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Metal, Commercial
- Location
- Ohio, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about OH/DOT: D08 Pavement and Culvert Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project to repair and/or pave the inverts of various bridge size culverts within District 8 including GRE-835-0091. Repair deteriorated portions of the CMP Steel for GRE-42-1490 and WAR-48-0677. Reset shifted concrete box culvert section, install new full |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Metal, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
