OH/DOT: D6 Bridge Replacement
Sector: Water Supply and Storage • Location: Morral, Ohio, United States of America
Source: Dodge
Bridge / Culvert Maintenance D06 Bridge-Culvert Repl - FY29 Bridge replacements along a few bridges-culverts throughout the District.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Bridge, Waste Processing and Treatment, Commercial
- Location
- Morral, Ohio, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about OH/DOT: D6 Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Bridge / Culvert Maintenance D06 Bridge-Culvert Repl - FY29 Bridge replacements along a few bridges-culverts throughout the District. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Morral |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Bridge, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
