logo
ProjectConstruction Documents

OH/DOT: Daniel Carter Beard Bridge Preservation

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

ype 3 emergency repairs to the Daniel Carter Beard bridge and approach bridges. Work that is not required in order to reopen I 471 SB traffic but is required to repair the structure to condition prior to the fire.Associated with PID 122820 (and DDIR/DSR)

Status
Closed
Sector
Bridge, Road, Commercial
Location
Cincinnati, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: Daniel Carter Beard Bridge Preservation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: Daniel Carter Beard Bridge Preservation” is an infrastructure initiative in the Bridge sector, located in Cincinnati, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ype 3 emergency repairs to the Daniel Carter Beard bridge and approach bridges. Work that is not required in order to reopen I 471 SB traffic but is required to repair the structure to condition prior to the fire.Associated with PID 122820 (and DDIR/DSR)

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Cincinnati

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project