logo

OH/DOT: IR 270 Paving Improvements

Sector: Bridge • Location: Ohio, United States of America

Source: Dodge USA

Project
Construction Documents

Pavement Maintenance FRA IR 270 0.55 7/1/2025 $1,500,000 Standard Build FRA-270-0.55-2.60 (Just East of Gantz Road to 71 interchange) Concrete Pavement Repair project on IR 270 in Franklin CountyFull Depth Concrete repairs, minor bridge work and upgrade guardrail as needed.

Status
Closed
Sector
Bridge, Road, Commercial, Cement, Mass Transit, Rail
Location
Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: IR 270 Paving Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: IR 270 Paving Improvements” is an infrastructure initiative in the Bridge sector, located in Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pavement Maintenance FRA IR 270 0.55 7/1/2025 $1,500,000 Standard Build FRA-270-0.55-2.60 (Just East of Gantz Road to 71 interchange) Concrete Pavement Repair project on IR 270 in Franklin CountyFull Depth Concrete repairs, minor bridge work and upgrade guardrail as needed.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial, Cement, Mass Transit, Rail

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project