OH/DOT: IR 70 Bridge Preventive Maintenance
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Resurfacing and related roadway work. Bridge preventative maintenance. Replace concrete pavement at I.R. 70/S.R. 285 ramp approaches (Old Washington)Remove Mine Inspection Holes from Gue-70 WB at SLM 14.10 (Approx. 48 Holes)PWL Density 2025 Trial Project
- Status
- Prospective
- Sector
- Bridge, Cement, Road, Car parking, Automotive, Commercial
- Location
- Old Washington, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about OH/DOT: IR 70 Bridge Preventive Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Resurfacing and related roadway work. Bridge preventative maintenance. Replace concrete pavement at I.R. 70/S.R. 285 ramp approaches (Old Washington)Remove Mine Inspection Holes from Gue-70 WB at SLM 14.10 (Approx. 48 Holes)PWL Density 2025 Trial Project |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Old Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Car parking, Automotive, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
