logo
ProjectPlanning Schematics

OH/DOT: IR 77 Bridge Preservation

Sector: Commercial • Location: Derwent, Ohio, United States of America

Source: Dodge USA

Bridge Preservation GUE IR 77 05.16 L/R Replace deck, repair backwalls and piers, paint existing structural steel, new bridge railing and approach slabs on SFN 3002616 IR 77-05.17 R and SFN 3002586 IR 77-05.17 L over SR 209.

Status
Prospective
Sector
Commercial, Rail, Steel, Bridge, Road, Metal
Location
Derwent, Ohio, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: IR 77 Bridge Preservation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: IR 77 Bridge Preservation” is an infrastructure initiative in the Commercial sector, located in Derwent, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Bridge Preservation GUE IR 77 05.16 L/R Replace deck, repair backwalls and piers, paint existing structural steel, new bridge railing and approach slabs on SFN 3002616 IR 77-05.17 R and SFN 3002586 IR 77-05.17 L over SR 209.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Derwent

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Rail, Steel, Bridge, Road, Metal

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project