OH/DOT: Jefferson Truck Parking Stop - Primitive Restrooms
Sector: Solar • Location: Steubenville, Ohio, United States of America
Source: Dodge USA
Primitive restrooms at truck parking stop. Precast building with waterless latrine and underground storage vault. Includes concrete sidewalks and bollard protection in front of building. No utilities hook ups (i.e. no electricity/sanitary/plumbing). Add on solar light kits and mechanical venting package. Vault latrines/toilet buildings will be installed along SR 7 in Jefferson County, Ohio. The pr
- Status
- Closed
- Sector
- Solar, Cement, Power Transmission, Car parking, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial
- Location
- Steubenville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about OH/DOT: Jefferson Truck Parking Stop - Primitive Restrooms
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Primitive restrooms at truck parking stop. Precast building with waterless latrine and underground storage vault. Includes concrete sidewalks and bollard protection in front of building. No utilities hook ups (i.e. no electricity/sanitary/plumbing). Add on solar light kits and mechanical venting package. Vault latrines/toilet buildings will be installed along SR 7 in Jefferson County, Ohio. The proposed locations are along Northbound and Southbound SR 7, between mile markers 4.5 4.7 in Jeffer... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Steubenville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Cement, Power Transmission, Car parking, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
