OH/DOT: Phase 2A- New Roadway Construction Group 9.3.24
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Phase 2A - Construct majority of earthwork and drainage. Complete design for Phase 2A/2B, purchase Right-Of-Way, and construct the eastbound lanes of the proposed Chesapeake Bypass (state Route 7) from the interchange of state Route 7 and state Route 527 eastward to the new interchange with state Route 775. The State of Ohio, Department of Transportation District 9 may be seeking a consultant to p
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Road
- Location
- Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about OH/DOT: Phase 2A- New Roadway Construction Group 9.3.24
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents, Pre-Design |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 2A - Construct majority of earthwork and drainage. Complete design for Phase 2A/2B, purchase Right-Of-Way, and construct the eastbound lanes of the proposed Chesapeake Bypass (state Route 7) from the interchange of state Route 7 and state Route 527 eastward to the new interchange with state Route 775. The State of Ohio, Department of Transportation District 9 may be seeking a consultant to provide design and engineering services for Phase 2A- new roadway construction right-of-way, updat... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
