logo
ProjectPlanning Schematics

OH/DOT: SR 133 Bridge Preservation

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Bridge Preservation CLE SR 133 22.12 Standard Build Project to replace the bridge, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32.

Status
Prospective
Sector
Bridge, Commercial, Road
Location
Ohio, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: SR 133 Bridge Preservation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: SR 133 Bridge Preservation” is an infrastructure initiative in the Bridge sector, located in Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Bridge Preservation CLE SR 133 22.12 Standard Build Project to replace the bridge, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Commercial, Road

Article published date

2024-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project