OH/DOT: SR 229 Drainage System Maintenance Group - 5.5.25
Planning schematics · Ohio · Last reported Jan 2025
Source: Dodge
MRW-229-5.80 MRW SR 229: The existing storm sewer will be upsized to address capacity needs, and the roadway profile adjusted to prevent future roadway overtopping. The State of Ohio, Department of Transportation, District 6, may be seeking a consultant to provide SR 229 Drainage System Maintenance.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Raw Materials, Waste Processing and Treatment
- Location
- Marengo, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about OH/DOT: SR 229 Drainage System Maintenance Group - 5.5.25
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MRW-229-5.80 MRW SR 229: The existing storm sewer will be upsized to address capacity needs, and the roadway profile adjusted to prevent future roadway overtopping. The State of Ohio, Department of Transportation, District 6, may be seeking a consultant to provide SR 229 Drainage System Maintenance. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Marengo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Raw Materials, Waste Processing and Treatment |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
