OH/DOT: SR 61 Two Lane Resurfacing
Sector: Manufacturing (Industrial) • Location: Norwalk, Ohio, United States of America
Source: Dodge
For Improving Various Sections In The City Of Norwalk, And Within Norwalk Township, Of Huron County, Ohio, In Accordance With Plans And Specifications By Performing Pavement Repairs And Resurfacing Sections Of State Route 61, From 16.98-17.35 (Toledo Rd To W. Main St.), And From 18.25-20.38 (Cortland Ave To East Of S. Old State), And Us Route 250 From 0.75-5.10 (S. Norwalk Rd), Including All Relat
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial, Car parking, Automotive
- Location
- Norwalk, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about OH/DOT: SR 61 Two Lane Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For Improving Various Sections In The City Of Norwalk, And Within Norwalk Township, Of Huron County, Ohio, In Accordance With Plans And Specifications By Performing Pavement Repairs And Resurfacing Sections Of State Route 61, From 16.98-17.35 (Toledo Rd To W. Main St.), And From 18.25-20.38 (Cortland Ave To East Of S. Old State), And Us Route 250 From 0.75-5.10 (S. Norwalk Rd), Including All Related Items Of Work. Porject Includes A Signiificant Amount Of Sidewalk And Curb Ramp Replacement, A... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Norwalk |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial, Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
