logo
ProjectPlanning Schematics

OH/DOT: SR 7 Culvert Preservation

Planning schematics · Ohio · Last reported Oct 2024

Source: Dodge USA

Bridge Preservation Culvert Repair. GAL 7 2.48 (CFN 2700158).GAL SR 7 2.48 SFN 2700158).

Status
Prospective
Sector
Water Supply and Storage, Commercial, Road, Bridge, Waste Processing and Treatment
Location
Gallipolis, Ohio, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: SR 7 Culvert Preservation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: SR 7 Culvert Preservation” is an infrastructure initiative in the Water Supply and Storage sector, located in Gallipolis, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Bridge Preservation Culvert Repair. GAL 7 2.48 (CFN 2700158).GAL SR 7 2.48 SFN 2700158).

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Gallipolis

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Road, Bridge, Waste Processing and Treatment

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project