logo
ProjectPlanning Schematics

OH/DOT: US 23 Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

2 WOO 101335 Bridge Preservation WOO US 23 20.83 Bridge Repl. Replace existing WOO-23-2083 bridge (SFN 8701598); perform necessary related work.

Status
Prospective
Sector
Bridge, Road, Commercial
Location
Custar, Ohio, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about OH/DOT: US 23 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OH/DOT: US 23 Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Custar, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

2 WOO 101335 Bridge Preservation WOO US 23 20.83 Bridge Repl. Replace existing WOO-23-2083 bridge (SFN 8701598); perform necessary related work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Custar

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project