Ohio River Bridges Downtown Crossing
Sector: Bridge • Location: Kentucky / Southern Indiana, United States of America
Source: Federal Highway Administration (FHWA)
The Downtown Crossing project includes the new Abraham Lincoln Bridge across the Ohio River, and associated roadway and facilities, connecting Louisville, Kentucky and Clark County, Indiana. The bridge carries six lanes of northbound I-65. The existing Kennedy Bridge, located immediately upstream is being rehabilitated and reconfigured to carry six lanes of I-65 southbound. The project also includ
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Downtown Crossing project includes the new Abraham Lincoln Bridge across the Ohio River, and associated roadway and facilities, connecting Louisville, Kentucky and Clark County, Indiana. The bridge carries six lanes of northbound I-65. The existing Kennedy Bridge, located immediately upstream is being rehabilitated and reconfigured to carry six lanes of I-65 southbound. The project also includes improved and expanded approaches and the reconstruction of the Kennedy Interchange between I-65, I-64, and I-71 in downtown Louisville to eliminate design deficiencies and safety hazards. The project is one half of the bi-state Ohio River Bridges project, which also includes the new East End Crossing, also spanning the Ohio River eight miles to the north, connecting I-265/SR 265 in Indiana to I-265/KY 841 in Kentucky. The Commonwealth of Kentucky leads the Downtown Crossing project and the State of Indiana leads the East End Crossing project. The Downtown Crossing project is being delivered through a design-build contract between KYTC and Walsh Construction Co. awarded in November 2012. The Downtown River Bridge (and East End Bridge) will be tolled, which will back bonds sold by KPTIA to partially finance the project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
