Ohridska Banka - MCFF Non recourse portion
Sector: Residential
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering a funded non recourse Co-financing Facility (MCFF) of €5 million for Ohridska Banka Societe Generale (‘OB’), Macedonia. The operation will enable OB to accommodate existing and future clients’ needs for larger loans with longer maturities where single exposure lending limits restrict the OB’s ability to provide the full range of funding and services to its larger clients. T
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | cancelled |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The EBRD is considering a funded non recourse Co-financing Facility (MCFF) of €5 million for Ohridska Banka Societe Generale (‘OB’), Macedonia. The operation will enable OB to accommodate existing and future clients’ needs for larger loans with longer maturities where single exposure lending limits restrict the OB’s ability to provide the full range of funding and services to its larger clients. The MCFF line will set standards of business conduct by requiring that the sub-loan assessment, conditions and covenants including environmental and integrity risk appraisal are in line with EBRD standard. Ohridska Banka is the fourth largest bank in FYR Macedonia with Total Assets of €395 million as of 30 Sep 2011 and a network consisting of 28 branches. Societe Generale is the dominant shareholder and holds 70 per cent of Ohridska’s capital. €5 million co-financing limit for co-financing OB’s new and existing exposures. €5 million. Categorised FI. OB will be required to comply with EBRD’s Environmental Performance Requirement (“PR”) 9 when making local loans, conduct their business in accordance with PR 2, adhere to the EBRD's Environmental and Social Exclusion and Referral Lists, and submit Annual Environmental and Social Reports to the Bank. The subsidiary borrowers will be required to comply with applicable national environmental, health and safety and labour requirements. The TC support for the implementation of the MCFF project is funded by the Western Balkans Multi Donor Fund. TC funded consultants will assist OB’s loan officers in implementing the special EBRD requirements which are not a standard part of OB’s lending practice. They will focus on assisting the PBs in the region including OB to strengthen credit controls and improve the quality of the credit approval process through additional appropriate training. Filip Kotora, Member of the Board of Directors Tel. + 389 2 3203 729 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Residential projects
- Illusuak Cultural Centre
- University Of Calgary - Mackimmie Complex Civil And Landscape Redevelopment
- Lowe's Home Improvement Warehouses
- Manitoba Hydro High Voltage Test Facility
- Merit Contractors Association Tenant Improvement
- Coca-Cola Centre
- Leaside Village at 85 Laird Drive
- Humber College Building NX Deep Energy Retrofit
