logo

Oiapoque plant

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Active

The project entails the development and operation of a solar PV plant in Oiapoque, state of Amapa with a capacity of 4 MW. This facility will be a part of the Oiapoque hydro-thermal power plant. The construction of the 4 MW solar unit adds to the initial project which combines a thermal unit (12 MW commissioned in December 2015) and a hydro power plant (7.5 MW), the completion of which is expected

Project Information FAQ

Project Information

5 Q
The project “Oiapoque plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the development and operation of a solar PV plant in Oiapoque, state of Amapa with a capacity of 4 MW. This facility will be a part of the Oiapoque hydro-thermal power plant. The construction of the 4 MW solar unit adds to the initial project which combines a thermal unit (12 MW commissioned in December 2015) and a hydro power plant (7.5 MW), the completion of which is expected in 2021. Voltalia had won in 2014 the tender organized for the isolated site of Oiapoque, a city of 24 000 inhabitants not connected to the national electricity grid. An additional transmission line will also be built and owned by Voltalia. The company was granted a 15-year electricity purchase contract under the same terms as the hydro and thermal plants (fixed tariff). This is a greenfield project launched on a BOO basis. The contract was awarded following a competitive bidding in 2014. Project was completed and commissioned in the beginning of December 2017. Investment amount and financial structure were not disclosed. http://www.martifersolar.com/downloads/170123-Voltalia-Oiapoque-solaire-vdef-EN.PDF

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data