logo

Oiapoque plant

Sector: Solar • Location: Brazil

Source: World Bank Group

Project
Active

The project entails the development and operation of a solar PV plant in Oiapoque, state of Amapa with a capacity of 4 MW. This facility will be a part of the Oiapoque hydro-thermal power plant. The construction of the 4 MW solar unit adds to the initial project which combines a thermal unit (12 MW commissioned in December 2015) and a hydro power plant (7.5 MW), the completion of which is expected

Status
Prospective
Sector
Solar, Hydro, Geothermal, Commercial, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Oiapoque plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Oiapoque plant” is an infrastructure initiative in the Solar sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the development and operation of a solar PV plant in Oiapoque, state of Amapa with a capacity of 4 MW. This facility will be a part of the Oiapoque hydro-thermal power plant. The construction of the 4 MW solar unit adds to the initial project which combines a thermal unit (12 MW commissioned in December 2015) and a hydro power plant (7.5 MW), the completion of which is expected in 2021. Voltalia had won in 2014 the tender organized for the isolated site of Oiapoque, a city of 24 000 inhabitants not connected to the national electricity grid. An additional transmission line will also be built and owned by Voltalia. The company was granted a 15-year electricity purchase contract under the same terms as the hydro and thermal plants (fixed tariff). This is a greenfield project launched on a BOO basis. The contract was awarded following a competitive bidding in 2014. Project was completed and commissioned in the beginning of December 2017. Investment amount and financial structure were not disclosed. http://www.martifersolar.com/downloads/170123-Voltalia-Oiapoque-solaire-vdef-EN.PDF

Original sector

Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Hydro, Geothermal, Commercial, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project