logo

OIT Brasil Offices / Juliana Santana Arquitetura

Sector: Steel

Source: ArchDaily

Project
Closed

In the training rooms and director's office, as well as in the workspaces and internal circulations, vinyl flooring meets the criteria for good maintenance and sound absorption. The lighting design is modular and with the specification of low-energy consumption equipment (LED). The program of needs for the pantry/kitchen is aimed at modernizing its installations and finishes and expanding the dini

Project Information FAQ

Project Information

3 Q
The project “OIT Brasil Offices / Juliana Santana Arquitetura” is an infrastructure initiative in the Steel sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In the training rooms and director's office, as well as in the workspaces and internal circulations, vinyl flooring meets the criteria for good maintenance and sound absorption. The lighting design is modular and with the specification of low-energy consumption equipment (LED). The program of needs for the pantry/kitchen is aimed at modernizing its installations and finishes and expanding the dining area. The locker room consists of a shower, lockers, and a washbasin, with materials available on the market. Still regarding energy efficiency, a photovoltaic system was installed for the microgeneration of energy. The panels were installed in the parking area with an approximate power of 75 kW. With the improvement of the envelope and reflective roof painting, the savings are almost 70% of the consumption. The installation of the main guardhouse was based on international security terms.For example: In the circulations, where the installations pass, the ceiling is mineral in panels, for better maintenance. In the workspaces, the material is gypsum board with glass wool for better sound insulation. In the training rooms, director's office, and co-working space, a material with better performance for noise treatment was specified, due to the specific use of these spaces. The building is well lit and to meet the goal of improving energy efficiency, glass partitions were chosen. In internal circulation areas in technical areas, the panels are made of glass with frosted film application, so natural light permeates between the spaces but maintains privacy. The replacement of facade glass was based on simulations to achieve better performance and thus reduce the energy consumption of air conditioning.Text description provided by the architects.The scope for the modernization of the headquarters building was based on the following design guidelines: Safety: External agents, environmental phenomena, vandalism, attacks, and urban violence; New cementitious board covering for the protection of electrical installations. Health: Indoor air quality; Use of materials that are not harmful to users; Ergonomic environments. Soundproofing: New cementitious board covering; Acoustic treatment ceiling; Double glazing in special environments; Individualized environments. Ergonomics: Furniture with better ergonomic performance. Sustainability: Dry construction; Replacement of facade glass; Structure and materials that facilitate maintenance; Collection and reuse of rainwater; Roof painting with reflective paint; Air conditioning system with better energy efficiency; Lighting with better energy efficiency. The project has as its main elements in its conception the preservation of some constructive and formal elements of the original building, such as the overhead steel structure, water mirrors, exposed concrete, and modulation of the facade frames and also the circulation of the central courtyard. To isolate the building's installations, a new roof was created over the existing beams and a ceiling below them. The specified material for the ceiling meets the specific function of each space.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data