Okabena Infrastructure Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Project includes the following Work: 5,800 LF open cut watermain, 460 LF trenchless watermain, 2,300 LF open cut sanitary sewer, 80 LF trenchless sanitary sewer, 700 LF sanitary sewer CIPP lining, sewer service lining, 2,500 LF storm sewer, 15,200 SY bituminous paving, 15,200 SY cement stabilized subgrade, 3,800 LF curb and gutter, and 1,000 SF concrete sidewalk.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Water Supply and Storage, Automotive, Commercial, Cement, Government
- Location
- Okabena, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Okabena Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: 5,800 LF open cut watermain, 460 LF trenchless watermain, 2,300 LF open cut sanitary sewer, 80 LF trenchless sanitary sewer, 700 LF sanitary sewer CIPP lining, sewer service lining, 2,500 LF storm sewer, 15,200 SY bituminous paving, 15,200 SY cement stabilized subgrade, 3,800 LF curb and gutter, and 1,000 SF concrete sidewalk. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Okabena |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Water Supply and Storage, Automotive, Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
