logo

Oken Swale Maintenance

Sector: Waste Processing and Treatment • Location: Santa Rosa, California, United States of America

Source: Dodge

Project
Closed

Project Description: The Work consists of improving the capacity of an existing swale that drains through a rock-lined culvert inlet located at 5151 Petaluma Hill Road, Santa Rosa, California in an unincorporated area of Sonoma County. The Work includes, but is not limited to, recapturing and expanding the swale capacity, expanding the existing berm, and installing permanent erosion control. Subst

Status
Closed
Sector
Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government
Location
Santa Rosa, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Oken Swale Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Oken Swale Maintenance” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Santa Rosa, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Description: The Work consists of improving the capacity of an existing swale that drains through a rock-lined culvert inlet located at 5151 Petaluma Hill Road, Santa Rosa, California in an unincorporated area of Sonoma County. The Work includes, but is not limited to, recapturing and expanding the swale capacity, expanding the existing berm, and installing permanent erosion control. Substantial Completion of the Work shall be completed within 30 Days from the date when Contract Time ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Santa Rosa

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project