logo

Olaf Anderson Office Building

Sector: Steel • Location: Fargo, North Dakota, United States of America

Source: Dodge USA

Project
Start

Construct A 2,744 S.F. Office Addition To Existing Office. This Build Will Include Concrete Foundations, Conventional Steel, Glu-Lam Timber, Metal Studs, Spray Foam, Aluminum Windows And Doors, Hollow Metal Windows And Doors, Ballasted Roof With Membrane. This Addition Does Not Exceed 10% Of The Existing Floor Area, It Is 9.9%. No Parking Lot Work For This Project. Square Feet: 2744

Status
Under Construction
Sector
Steel, Metal, Residential, Commercial, Forest Products and Packaging, Car parking, Cement, Automotive, Manufacturing (Industrial)
Location
Fargo, North Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Olaf Anderson Office Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Olaf Anderson Office Building” is an infrastructure initiative in the Steel sector, located in Fargo, North Dakota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct A 2,744 S.F. Office Addition To Existing Office. This Build Will Include Concrete Foundations, Conventional Steel, Glu-Lam Timber, Metal Studs, Spray Foam, Aluminum Windows And Doors, Hollow Metal Windows And Doors, Ballasted Roof With Membrane. This Addition Does Not Exceed 10% Of The Existing Floor Area, It Is 9.9%. No Parking Lot Work For This Project. Square Feet: 2744

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Fargo

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Metal, Residential, Commercial, Forest Products and Packaging, Car parking, Cement, Automotive, Manufacturing (Industrial)

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project