Old Albany Road Sidewalk
Sector: Water Supply and Storage • Location: Thomasville, Georgia, United States of America
Source: Dodge USA
the construction of the SR 38BU/Old Albany Rd from CS 817/ North Blvd to CS 790/ Plantation Oak Dr, PI #0015394 Project will be received at the Office of the City Engineer located at 411 W Jackson St, Thomasville, GA 31792 until Thursday, October 3, 2024 at 2:00 PM local time, at which time bids received will be publicly opened & read. The Work on the Project consists of a 2 ft curb & gutter along
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Bridge, Car parking, Waste Processing and Treatment, Road, Commercial, Automotive, Raw Materials, Residential
- Location
- Thomasville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Old Albany Road Sidewalk
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the construction of the SR 38BU/Old Albany Rd from CS 817/ North Blvd to CS 790/ Plantation Oak Dr, PI #0015394 Project will be received at the Office of the City Engineer located at 411 W Jackson St, Thomasville, GA 31792 until Thursday, October 3, 2024 at 2:00 PM local time, at which time bids received will be publicly opened & read. The Work on the Project consists of a 2 ft curb & gutter along the western side of the road;a 2 ft curb and gutter, 3-ft landscaped area, 5-ft sidewalk, and dr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Thomasville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Bridge, Car parking, Waste Processing and Treatment, Road, Commercial, Automotive, Raw Materials, Residential |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
