Old Brent Road Bridge REBID
Sector: Water Supply and Storage • Location: Forsyth, Georgia, United States of America
Source: Dodge USA
The Project consists of removing an existing double 96 inch CMP culvert and replacing the double culvert with a precast bridge on Old Brent Road crossing Todd Creek. The project will also require approximately 550 lineal feet of roadway and bridge approach construction. Design build services to complete the Old Brent Road Bridge Project in Monroe County, Project includes removal and disposal of an
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Bridge, Government, Road, Commercial
- Location
- Forsyth, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Old Brent Road Bridge REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of removing an existing double 96 inch CMP culvert and replacing the double culvert with a precast bridge on Old Brent Road crossing Todd Creek. The project will also require approximately 550 lineal feet of roadway and bridge approach construction. Design build services to complete the Old Brent Road Bridge Project in Monroe County, Project includes removal and disposal of an existing hydraulically deficient and deteriorated double 96 inch CMP culvert and replacement of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Forsyth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Bridge, Government, Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
