Old Orchard Pump Station Upgrade in the Town of Grimsby
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Old Orchard Sewage Pumping Station (SPS) was constructed in 1985 and services a small neighborhood community of 400 people in a highly desirable Lake Ontario shoreline area of Grimsby. This pumping station has a history of sanitary spills to the environment (Lake Ontario) as a result of increase flows from wet weather events (rain). It appears that this problem is being exacerbated by the impacts
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Old Orchard Pump Station Upgrade in the Town of Grimsby
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Old Orchard Sewage Pumping Station (SPS) was constructed in 1985 and services a small neighborhood community of 400 people in a highly desirable Lake Ontario shoreline area of Grimsby. This pumping station has a history of sanitary spills to the environment (Lake Ontario) as a result of increase flows from wet weather events (rain). It appears that this problem is being exacerbated by the impacts of climate change. In addition the pumping station has reached the end of its service life and this is compounding the challenge to transfer the increased volume of sewage to the Baker Road Wastewater Treatment Plant. This project will reduce CSO (Combined Sewer Overflows) to the lake and beach front areas as well as extending the capabilities of the station to meet Levels of Service for another 20 years. The project includes: Forcemain replacement Valve and bypass chamber Pumps (two) Process piping Security upgrade (e.g. gates and hatches), Electrical control panel complete with a new weather shelter Instrumentation controls. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
