Old Soo Road Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Hot Mix Asphalt ? Granular B? Type II ? 3600 x 2000 mm Precast Concrete Open Footing Culvert ? Erosion Protection ? Steel Beam Guide Rail ? Retained Soil System Wall with Finishing Cap
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Cement, Rail, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Sudbury, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Old Soo Road Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-qualification |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Hot Mix Asphalt ? Granular `A? ? Granular `B? Type II ? 3600 x 2000 mm Precast Concrete Open Footing Culvert ? Erosion Protection ? Steel Beam Guide Rail ? Retained Soil System Wall with Finishing Cap |
Procurement method |
Location
Country | Canada |
State | Ontario |
City | Sudbury |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Rail, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
