Old Trapper Facility Project A Improvements
Construction documents · Oregon · Last reported Oct 2024
Source: Dodge USA
project is designed to expand the packaging function of the current production area and connect it to the new warehouse. This project will be a 19,400 SF footprint. The exterior wall panels are planned to be prefabricated concrete, with rigid insulation within the two concrete panels. At the interior, production side of the wall, it is planned to have a three-layer fiberglass system to provide a h
- Status
- Closed
- Sector
- Manufacturing (Industrial), Warehouse, Commercial, Cement, Waste Processing and Treatment
- Location
- Forest Grove, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Old Trapper Facility Project A Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | project is designed to expand the packaging function of the current production area and connect it to the new warehouse. This project will be a 19,400 SF footprint. The exterior wall panels are planned to be prefabricated concrete, with rigid insulation within the two concrete panels. At the interior, production side of the wall, it is planned to have a three-layer fiberglass system to provide a hygienic, food safe surface. The slab will be sloped to a continuous trench drain system. There wi... |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Forest Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Warehouse, Commercial, Cement, Waste Processing and Treatment |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
